-
Calculate Percentage of Steel.
How to calculate percentage of steel required or to be used?
-
Shear Walls and Core Walls Reinforcement Details
What is the maximum ratio steel used in Shear Walls and Core Walls?
-
Earth Quake Engineering
Which of the following helps Assam type building to remain intact during an earthquake,
(A) RCC bands.
(B) Tie beam.
(C) Frame action.
(D) Footing. -
Structural Compressive Load
A steel pipe 10 feet long is able to withstand 15 tonnes of tensile load. Can you trust this pipe to withstand a 15 tonne compressive load?
-
Theodolite Surveying
What are the advantages of making face left and face observation in theodolite survey?
-
Expansion Joint
We had Constructed the RCC Building both Ground and First Floor of length 265 Feet without Expansion Joint. What will happened?
-
OPC 43 & 53 Cement Grades
What difference between OPC 43 & 53 Cement Grades
-
-
-
DMC Pile Foundation
How DMC Pile Foundation is done?
-
Sunk Toilet Slab
W.C. slab is generally are sunk by about 50 cm. below general floor level for Indian type water closet. What is the term called and what is the purpose of this?
-
Foundation Capacity
How to find out the load applied by a house foundation.
-
-
-
-
High raised building construction
Soil density test, bearing capacity of soil?
-
Design Mix
What is the procedure of design mix?
-
Volumes of Wet and Dry Sand
How to differentiate the volumes of wet and dry sand / soil?
-
Compaction Measure
How to measure the compaction in high way base and sub-base and please inform what are the new techniques to measure compaction?
-
Turbulent Flow
What is turbulent flow through in pipe?
Civil Engineering Interview Questions
Ans