Quantity Survey Billing Engineer - Rate of verified tile flooring
Rate of verified tile flooring is less than that of dado...yes or no and give reason
-
Quantity Survey Billing Engineer - Disposal of derbies
Disposal of derbies any activity completion in contractors scope yes or no
-
Inverted and Hidden Beams
What are Inverted Beams and Hidden Beams ?
-
Quantity Survey Billing - rate excavation
Generally rate excavation with blasting is more than that with chiseling...say yes or no and give reason
-
Quantity Survey Billing - Excavation Material
Excavation Material is the property of excavation contractor,. yes or no
-
DMC Piling
What is the process of executing DMC piling?
-
Required quantity of steel
what is the method of calculate the requirement steel quantity in 1 cum RCC.
-
-
Cube test
I am casting Raft and get the cube .after seven days test the cube that was pass as per rule so i will testing after 28 day ? yes or no? and why?
-
-
Eexcavation level readings
We get excavation level readings more accurate with total station, say yes or no ( and give reason)
-
Quantity Survey Billing Engineer - maintenance of JCB.
JCB Hiring rate includes maintenance of JCB....yes or no
-
Structural design
I would like to obtain a free software for structural design of concrete elements.
Thanks
manoj -
Reinforcement in beam
Why do we provide extra reinfocement bars at the end portion of beam?and how we can calculate the amount of reinfocement?
-
RCC - Column, SLA, Beams and Cover
Explain what are Column, SLA, Beams and Cover?
-
Working Drawing v/s Submission Drawing
What is the different between Working drawing and Submission drawing?
-
Bulking of sand
What do u mean by bulking of sand
-
Percentage of Steel and Concrete
How many Percentage of Steel and Concrete in a column and Slab
-
RCC Vs Steel Design
What are the basic differences between the RCC design & Steel design?
-
Precast Concrete Connections
How are precast concrete connections constructed?
Civil Engineering Interview Questions
Ans