Yes,Integration testing is a validation testing.Integrating testing is done to check the interlink between the modules(combinely testing the modules) i.e, whether the modules are correctly connecting thru the interface provided.
Telecom testing is an automated, controlled method of verifying operation of your products before they go to market. Any product that connects to the PSTN (public switched telephone network) or a tel...
HI we conduct load test to estimate how the application responds when no.of users using the that application. so these no.of users are called losd size
HI The documents are varying depends on organization.but for any organization the following are mandatory .But some organizations named it in diffrent terminology1.Test approach2.Test plan3. RTM4....
Haresh Babu
Jun 1st, 2006
HI, All Delivribles which we are giving to client are called Testing reporsDelivirables are,1)Test plan2)Test Strategy3)Scenarios4)Test Cases5)Defect LogContents of...
Hi Friends! Before going to discuss the diffrences of these two u observe the fact that the client requirements may be changed on some time. Depend on the requirements we do our work ....
vlmadala
Jun 8th, 2006
DIfference between Water fall model & W modelWaterfall model:Based on the assumption thatrequirement will not change during the life cycle of the project, whereas requirement can change at any pha...
In Product Developed company, their could be 2 types of developments 1) Developing a Project according to Customer requirements and 2) Developing a product and then sell it to customer.In both ca...
Sreenath
May 23rd, 2006
Environment in product development:- Generally the developers will develop the funtionality(Enhancement or modifications) and make the entire application as a build(including modifications)...
1.Defect Age is the time between Defect Detection to its Fixing and Closure.Defect life Cycle starts with its detection and ends with its removal.2.Is correct as per my knowladge
Leena Saraf
May 17th, 2006
As per my knowledge,Defect age is time of introduction of defect to time of detection.suppose there is defect which has been there in build 6.1074 and detected in 6.1078 build means last four bui...
Integration Testing comes under White Box Testing, after testing individual units in unit testing all of them should be tested for working in integration with each other, Integration Testing...
Manali
Jun 8th, 2006
Integration Testing comes under White Box Testing, after testing individual units in unit testing all of them should be tested for working in integration with each other, Integration Testing...
Elapsed Time is the amount of time that has passed in the scenario since the Vuser began running. The refreshrate ('n' sec ) of the vuser elapsed time will update the value every n seconds.E...
sreenivasulu
Apr 13th, 2006
elapsed time:elapsed time is defined as web request transmission time+server in process time + response transmission time.example is yahho or gmail any application
Installation testing is a Non-functional testing where as Upgrade & Migration Testings are Functional testings.During Installation Testing, we wont check for the functionality.During Upgrade Testi...
kumar surapaneni
May 31st, 2006
Installation is a part of Functionality ( installation testing) here we check Occupied memory size after installation and ease of use during installation.
Hi,Smart Identification is one ofthe good feature in QTPyou captured the all objects Properties using Qtpwhile executing the application the the properties of the objects may change as it i...
hi prasahanth yah i read ur answer its gug, can u help me i have few doubts,1. What are the testings performed in functional testing ( for ex: in GUI testing we will check for company specified ...
hi.....The answr for 1 n 2 are correct.Cookie : A small text file of information that certain Web sites attach to a user's hard drive while the user is browsing the Web site.It holds the sites visited..shopping carts etc.
xyz
May 29th, 2006
Start up script is a one which will be loaded by winrunner each time when you start Winrunner.So it will load all the contents of start up script in memory.Go to c:\Program Files\Mercury Interactive\b...
Hi, Performance Testing using RPT:1. Every page which you navigate in the testing, will be shown2. You can know the default / entered data into the web site/ page 3. More advanced reports The above features are not there in Robot VU. Bhaskar
Ans