Please give details about ETVX criteria and Build Refresh criteria

Questions by sundar75_mca

Showing Answers 1 - 2 of 2 Answers

kumar k

  • Oct 27th, 2006
 

ETVXE- Entry CriteriaT- TaskV- ValidationX- Exit CriteriaENTRY CRITERIA: Input with 'condition' attached.e.g. Approved SRS document is the entry criteria for the design phase.TASK: Procedures.e.g. Preparation of HLD, LLD etc.VALIDATION: Building quality & Verification activitiese.g. Technical reviewsEXIT CRITERIA: Output with 'condition' attached.e.g Approved design document

  Was this answer useful?  Yes

cyber

  • Dec 22nd, 2006
 

Entry Criteria Requirements Entry criteria Need for developing a System Exit criteria Requirement Document.SRS Entry Criteria Requirement Doc Exit Criteria Design DocsSo on so forth..............

  Was this answer useful?  Yes