DOE does not improve the Process yields
Skill/Topic: Statistical Process ControlA) TrueB) FalseExplanation: Apart from improving the capability of a process, DOE also increases the process yields
-
A stable process still has a ________________
Skill/Topic: Statistical Process ControlA) VariationExplanation: Even though the process may be stable, it will still have variation. This variation could be due to Common causes.
-
___________ Causes variations in a Stable process
Skill/Topic: Statistical Process ControlA) Assignable causeB) Common CauseC) Random CauseD) None of the above
-
Control chart is a simple graph to see if the process is ______________
Skill/Topic: Statistical Process ControlA) Within control or not
-
-
-
What are all the different metrics that can be captured in Software Testing?
Apart from Schedule Variance and effort variance what metrics can be captured in Software testing?
-
Testing
1. How many types of reviews that we have in our testing?2. What is bad defect? why do we write bad defects?3. How RTM will be helpful for the QC team?
-
-
The two different types of data are ________ and ___________
Skill/Topic: Statistical Process ControlA) Variables and AttributesExplanation: Variables are those quality characteristics that are measurable like height, weight while Attributes are those quality characteristics that are classified as either conforming or not conforming to the specifications like OK-Not OK, Good- Bad
-
Results of probabilistic relationships is best explained by a __________
Skill/Topic: Statistical Process ControlA) Linear CurveB) HistogramC) Bell Shaped CurveD) pie-chart
-
Mean Chart is also called as
Skill/Topic: Statistical Process ControlA) p ChartB) X Bar ChartC) C ChartD) R Chart
-
What is a Range in the Control Chart ?
Skill/Topic: Statistical Process ControlA) Range is the difference between the Highest observation in the Sample to the Lowest obervation in the sample
-
-
Cost Of Quality
Given the following costs: Requirement Analysis – Rs1000, Code Review – Rs500, Review of User Documents – Rs600, Continuing Education Programs – Rs800, Design – Rs400, Then what is the Cost of Quality?
-
When do we use a c-chart?
Skill/Topic: Statistical Process ControlA) It is used to monitor the number of defects per unit
-
What does DOE stands for ?
Skill/Topic: Statistical Process ControlA) Design of EngineeringB) Design of ExcellanceC) Design of ExperimentsD) Design of Engines
-
Improving the Control of variation ___________ the probability that the product or service will conform to specifications
Skill/Topic: Statistical Process ControlA) decreasesB) equalsC) improvesD) eliminatesExplanation: More the control on variations, more is the probability of the product or service meeting the specifications and standards
-
Quality assurance
What is the difference between Quality Assurance, Quality Control and Audit Function.
-
Acceptable Tolerance Limit
What is the maximum Acceptable Tolerance Limit for any product?
Quality Control Interview Questions
Ans