-
-
-
-
-
How to use QTP 8.2 Automation Scripts in Load Runner 8.1 for Load Testing Purpose.
More details on Question: I was trying to call the QTP Scripts from Load Runner Controller Scenario. There, I only see options for Vuser Scripts, GUI Scripts, Astra Tests and All Files(*.*) options in drop down box. Do I need to install QTP on Load Runner Server also to see this option. So that i can all QTP Scripts. Or please explain the procedure for reusing automation scripts of QTP to Load testing...
-
-
-
-
Which command in QTP Script used to capture real time values?
Which command in QTP Script used to capture real time values?If QTP does not support third party web based application which is to be tested for GUI interface,what will be our next approach?What are configuration management Techniques?Difference between sanity testing and smoke testing? when will we use these testing?Comparison between weights and checkpoints.what is batch Testing?What is the difference...
-
-
-
-
-
-
-
-
Entry").JavaButton("Enter").Exist 10
What is the maximum amount of time the statement will wait for the
specified object to appear?
A 20 seconds
B 10 seconds
C 30 seconds
D 10 milliseconds
E 20,010 milliseconds
">Q. The object synchronization timeout (Test > Settings > Run tab) setting is set to 20,000 milliseconds (20 seconds).Consider the following statement: JavaWindow("Trade Manager").JavaDialog("Trade Entry").JavaButton("Enter").Exist 10What is the maximum amount of time the statement will wait for the specified object to appear?A 20 seconds B 10 seconds C 30 seconds D 10 milliseconds E 20,010 milliseconds
-
-
-
QTP Interview Questions
Ans