Minimum Weighing Operations
If we have to weigh 31 kgs of rice using only 1 kg stone. What are the minimum number of weighing operations required?
-
Pipes are laid by an oil company
Pipes are laid by an oil company. If the company has to lay down 3km of pipes and each pipe is 25 meters long, calculate and print the number of pipes needed to cober the distance
-
-
Find the next number in the series 3, 4, 6, 9, 13,?
Next number will be 18.This is fibonacci series X, X+1, X+2, X+3.....
-
-
-
-
-
-
English and Telugu
In a class of 150 students 55 speak English; 85 speak Telugu and 30 speak neither English nor Telugu. 1. How many speak both English and Telugu?2. How many speak only Telugu?3. How many speak at least one of the two languages from English and Telugu?
-
Aptitude work days Question
Person A can complete the job in 10 days, Person B can complete the job in20 days. If both together work then in how many days they will finish d work ?
-
Time Calculation
There are 4 women having walking speed as 1min, 2min, 4min, 5min. If one or two women can cross bridge at a time with flashlight, then what is min. time required for 4 women to cross bridge without using flashlight?
-
9 Digit Numbers
How many 9 digit numbers are possible by using the digits 1,2,3,4,5 which are divisible by 4 if the repetition is allowed?
-
Find the Poisoned Can
If there are 30 cans out of them one is poisoned if a man tastes very little he will die within 14 hours. Now mice are used to test in 24 hours, how many mices are required to find the poisoned can?
-
Base Eight Numbering
The citizens of planet X are 8 fingered and have thus developed their decimal system in base 8. A certain street on planet X contains 1000 buildings numbered 1 to 1000. How many 3s are used in numbering these buildings?
-
Aptitude Power Unit Question
A power unit is there by the bank of the river of 750 meters width. A cable is made from power unit to power plant opposite to that of the river and 1200mts away from the power unit. The cost of the cable below water is Rs.15/- per meter and cost of cable on the bank is Rs.12/-per meter. Find the total of laying the cablea. 15550 b. 15650 c. 16560 d. 16650 e. None of these
-
A company gives out bonuses
A company gives out bonuses based on the amount of income generated by their sales representatives per month. Once the income generated is greater than or equal to $10,000 a bonus of 20% is given. If the income generated is greater than or equal to $8000 but less than $10,000 a bonus of 15% is given. If the income generated is greater than or equal to $5000 then a 3% bonus is given. Read the income...
-
Calculate and print the amount of money paid to each worker
A carpenter is paid a contract fee of $2000 for 3 days work. He hires 3 workers who work for 3 days at $75 a day. Calculate and print the amount of money paid to each worker, the total paid to each worker,the total paid to all workers and the amount the carpenter is left with.
-
Find Possible Number of Combinations
There are A, B techers and C,D doctors. Find the possible no. of combinations that should not be repeated more than once?
-
Aptitude Interview Questions
Ans