There is a misconception with boundry value analysis & most of comments were effected with it.BVA applies -1 & +1 but one for each boundry.example : Range = 1 - 999.99the correct Boundry Values for the given scenario?: -0.99,1,999.99,1000
In web application we concentrate more on security testing. First we check the UI then functionality of each and every field as per customer requirements, checking for broken links and also navigation...
Allam,Its quite simialar as u did for Clients server application.In web based applacation, we first test the applcation interface whether its user friendly or not. and look for the images on a i...
I apologise to differ with you on the above made statements. WaterFall Model is referred to as Linear Sequential Model. As in the case of developing a project, the requirements may change at any phase...
"System Development Life Cycle Model" is also known as the "Linear Sequential Model" (or) "Classic Life Cycle Model". the Linear Sequential Model has the following activities.1. System...
Six Sigma represents the manner in which different business domains within an organization are categorized. e.g: Insurance domain, Marketing and Sales domain, Growth Industries, etc. These are also re...
A).An SRS is called Software / System Requeriements Specifications document. It will "literally", in simple english document the high level requirements that the software is supposed to...
"What in Orthogonal Array Testing" does not make sense. Did somebody mean to say "What IS orthogonal array testing"?
Badman
Feb 8th, 2007
Black-box technique that enables the design of a reasonably small set of test cases that provide maximum test coverage Focus is on categories of faulty logic likely to be present in the software compo...
Hi,See,there are basic three layers viz Presentation layer,Business logic and Database layer.Client Server technology is a TWO TIER concept.There are?two scenarios -1)?When Presentation layer & Busi...
kiran kumar Racherla
Feb 21st, 2006
Application contains 3 layers ,These are presentation layer,Bussiness logic,Database.In a client server Presentation layer ,Bussiness logic is present client place ,and database is present in server.That means database is centralized. Clent server arechitecture is is 2 -Tier Environment.
Test life cycle:1. Prepare the test strategy.2. Prepare the test plan.3. Prepare the test cases.4. Execute the test cases.5. Analyse the result.6. Do the regression testing.7. Submit the bug free buil...
Both are different.in test life cycle we discuss about testing,planning, developing,eecuting.reporting....bug life cycle is a part of testing. in this we discuss about defect profile document. how the defects are rectified, what is the status of defect, ie new, open, close, reopen,hold....
Latent bug is a bug which is not identified in one or two releases.
satya
Jul 6th, 2006
Hi, Latent Bug : it means that the bug which is not able to identified in present versions and can be able to identified in later versions..Let me know if this is wrong...Regards,Satya.ksatya_k21@yahoo.co.in
HiMandatory properties are nothing but while we are uploading the objects to object repository it will recognizes the objects by using Mandatory properties. if any of two objects having the same mandatory properties it will check for Assistive properties.Regards
Checking the functionality with multiple sets of values.Create a parameter (variable) and store different values that you want to test with. This is called parameterization. So when we run the script, vuser will take values from the parameter file.
In the question it should be stubswell comming to question both of them come in integration testing in small Stubs are the called compoents n are used in top -down approch drivers are the callin g component and are used in bottom-up approch
prasuna
Nov 16th, 2005
Hi,In the Question the thing should be stubs instead of steps.Drivers and Stubs concept comesin Integration testing.Drivers- The one which replaces the main module is called driver.Stubs- The modules ...
Hi Murali1 & 2. In IT companies, after project is confirmed , Your
TL will give Functional Requirement Document to you, when it is given, right form that date
you have to read that FRS documen...
sai
Nov 16th, 2006
understand the BDD (business design document) which was prepared by BA(business analyst) and next based on Functional specifications which was prepared by QA understand the total functionality and acc...
Ans