-
Frequently faced problems in report studio
what are the frequently faced problems while developing the reports in report studio? And how can those problems are debugged?
-
Restricting the values for a prompt
How can you restrict the number of values available for a prompt?
-
Value Prompt
Hello everyone, I am using Report Studio in Report Net. I have a value prompt that I would like to display a code number and its description. As it is now, it will only display either the code number or the description, not both. Is there anyway I can display both with a space in the middle? Thanks!!
-
Convert Crystal Reports into ReportNet or Cognos 8
How to convert Crystal Reports into Cognos Reports?
-
-
Cognos security
How we will provide security to the reports in cognos8?
-
Cognos 8 Report Studio Bookmarks
What is the procedure to create bookmarks to a report in Cognos 8 Report Studio?
-
Link Query to a Data Container
How can you link a query to a data container manually in Report Studio?
-
Cognos repository
When installing cognos one has a choice to use cognos native repository or use a dbms to store the repository. We are using an oracle database. Can anyone give me an advise which choice is better, considering stability, backup facilities, etcThx
-
Stiched Query
What is meant by Stiched Query?
-
Cognos 8.3 Version New Features
What are the new features in Cognos 8.3 v?
-
Burst Report
How to create burst report?
-
Framework Manager Dimensions
How to create Regular and measure dimensions? How we will use these dimensions in the report?
-
Cognos Logs
Production Support: Where and how to check Cognos Logs?
-
Report Page Breaks
How page breaks work in the report?
-
FrameWork Manager Properties
Explain the limited local and database only properties in Framework Manager? Why do we use these properties?
-
Build A Cube
How to build a Cube in Cognos 8 using Framework Manger?
-
Measure Dimension
What is Measure Dimension?
-
Repeater Object
What is the usage and procedure to create a repeater object?
-
Report Scheduling
How do you schedule reports in Cognos?
Cognos Interview Questions
Ans