-
RCC - Required Binding wire
(for 1.0MT steel), Nails & Lubricant (for 1.0 Sqm shuttering)
In RCC what are the required quantities for:
1. Binding wire required for 1.000 MT of TMT Reinforcement bars.
2. Nails for 1.00 Sqm Shuttering.
3. Lubricant/Black oil/ Deisel/ grease for 1.00 Sqm Shuttering. -
Quantity Survey Billing Engineer - maintenance of JCB.
JCB Hiring rate includes maintenance of JCB....yes or no
-
Cum to Meteric Tone
How can we convert Cum to Mt. in calculation of BC, DBM or WMM
-
-
Concrete Technology
How much of the strength of concrete comes from post-production curing?
-
-
Workability of Concrete
What can be the slump value in the case of following members as per IS recommendations1. Slab2. Beam3. Column4. Dam
-
-
-
Structural engineering
what is the difference between DEFLECTION AND DEFORMATION? Explain
-
Quantity Survey Billing - Excavation Material
Excavation Material is the property of excavation contractor,. yes or no
-
Cement estimation
no.of cement bag required in 30*50 plot having 4room(12*8) 2kitchen(5*8) 1hall(15*10) and 1w/c(4*4) and 1bath(6*4)
-
Concrete and Steel Forumla
What is the formula used to calculate 1. Steel and 2. Concrete
-
Calculate Column Rings and Bars
How to calculate number of rings of a column & how to calculate weight of column rings & column bars.
-
Thumb rule
What is thumb rule to calculate following if i know the construction area i.e plinth area.
1) Shuttering
2) Steel
3) Concrete
4) Brickwork
5) Plaster -
Estimate of RCC Concrete Slab
What is the cost estimate for building a 600 sq. ft. RCC Slab, including Sand, Cement, Metal, Steel and Labour?
-
Block Masonry
How much mortar used in Concrete Block Masonry ?
-
Hume pipes
What is meant by HUME in RCC Hume pipes?
-
Cube preparation
How many cubes( size 150*150*150)prepare for 1 cum of concrete as per is code
-
Civil Engineering Interview Questions
Ans