Surface Area of Cube
A 64 small cubes of size 1 unit to form a big cube after that the corner cubes are removed then the surface area of that cube?
-
Weight of Sheep Foot Roller
What is the weight of sheep foot roller in road construction?
-
-
OPC 43 & 53 Cement Grades
What difference between OPC 43 & 53 Cement Grades
-
Concrete Brickwork and Plastering
How many microns of sand we can use in concrete brickwork and plastering?
-
M30 Grade Concrete Mix Without RMC
We are trying to achieve M30 grade concrete manually at our site. We have customized the mixture machine and have bins with load cells to tell us the weights of coarse sand, cement and 0.75 and 0.50 inch Gitti. At present we are using (1:1.80:3.5) (50kg cement : 90 kg coarse sand : 175 kg Gitti) with 28 liters water and 250 ml add mix per 50 kg cement. 7 day testing of the cubes have given 15.01 MPA...
-
Concrete Mixing Grades
Dear Sir/Mrs ,
I want to Know the Concrete Grades and their ratios. Please send to me in detail .
With Thanks -
Site Engineer Duties and Responsibilities
What are the Duties and Responsibilities of a Site Engineer in irrigation site?
-
Difference Beetween PPC & OPC
Which cement is better for maintenance work, OPC or PCC?
and What is the grade of PPC & OPC? -
-
Theodolite Surveying
What are the advantages of making face left and face observation in theodolite survey?
-
Structural Compressive Load
A steel pipe 10 feet long is able to withstand 15 tonnes of tensile load. Can you trust this pipe to withstand a 15 tonne compressive load?
-
Hume pipes
What is meant by HUME in RCC Hume pipes?
-
PPC & OPC
which cement is better , OPC or PPC?
and what is the strengths of OPC & PPC ? -
RCC Pipes
What is the difference between Hume pipes, spun pipes, NP 2, NP3, NP4, pipes?Test requirements of above pipes.
-
-
What is diff between force and weight?
Force acts in any direction but weight acts only in downward direction
-
RCC - Required Binding wire
(for 1.0MT steel), Nails & Lubricant (for 1.0 Sqm shuttering)
In RCC what are the required quantities for:
1. Binding wire required for 1.000 MT of TMT Reinforcement bars.
2. Nails for 1.00 Sqm Shuttering.
3. Lubricant/Black oil/ Deisel/ grease for 1.00 Sqm Shuttering. -
Area of Column Calculation
How much steel is required for a column of 11 mtr. height and what is the total M3 area of column?
-
Cement estimation
no.of cement bag required in 30*50 plot having 4room(12*8) 2kitchen(5*8) 1hall(15*10) and 1w/c(4*4) and 1bath(6*4)
Civil Engineering Interview Questions
Ans