-
-
What are the latest methods to detect cracks in a building?
I would like to know in detail about the latest methods to detect cracks(micro cracks) in the building, especially the non destructive methods.
-
-
RC Concrete Roof
What is the full meaning of 1 in 40, concerning slope of a rc roof
-
Prestressed concrete
What is the max. % of steel (tendons) provided in prestressed beams? we know min. is 0.2 as per IS1343
-
High raised building construction
Soil density test, bearing capacity of soil?
-
-
Flyash Bricks
What is the composition of flyash bricks, by weight, by volume?
-
Development Length
Describe Development Length(Ld) for M20 Concrete and Fe500 Steel in Tension,Compression zones
-
Sieve analysis
What is the most usage of testing sieve analysis of soil
-
UAT
What is UAT? Can someone explain?
-
Cement Testing
Why standard consistency test of a cement is performed?
-
M30 strength
what is the min and max strength of M30(target strength is 38N/sq.mm)
-
Concrete Cube
The size of concrete cube is 150mm x 150mm x 150mm as per Indian Standards. Why?
-
Design basket ball post
A basketball post is to be constructed.height 10 ft and it has to offset 10 ft from the main post preffered to use round tube hollow steel tubes .can you give me some suggetions on shapes(how to cantilever the 10ft portion)member sizes etc it has to support weight of a player (100kg)
-
-
-
Soil Bearing Capacity
What is the bearing capacity of soil?
-
Industrial Building
How much opening area % (windows,doors) required for industrial building
-
Beam Question
A beam carrying two point loads; each point load comprises a beam-end reaction from two of the beams in part (a). The beam span is 9 meters and the point loads are applied at the third points; i.e. 4m from each end with a 4m gap between them. No allowance has been made for self-weight.
this has to be in accordance with EC2, for moment capacity, shear capacity and deflection, carrying out...
Civil Engineering Interview Questions
Ans