-
RCC - Required Binding wire
(for 1.0MT steel), Nails & Lubricant (for 1.0 Sqm shuttering)
In RCC what are the required quantities for:
1. Binding wire required for 1.000 MT of TMT Reinforcement bars.
2. Nails for 1.00 Sqm Shuttering.
3. Lubricant/Black oil/ Deisel/ grease for 1.00 Sqm Shuttering. -
Quantity Survey Billing Engineer - maintenance of JCB.
JCB Hiring rate includes maintenance of JCB....yes or no
-
Cum to Meteric Tone
How can we convert Cum to Mt. in calculation of BC, DBM or WMM
-
-
-
Soil Bearing Capacity
What is the bearing capacity of soil?
-
Ratio about concrete
what is the quantity of 20mm concrete, sand used for 1 CUM R.C.C
-
-
-
VDF
What is the VDF?
-
Eexcavation level readings
We get excavation level readings more accurate with total station, say yes or no ( and give reason)
-
Reinforcement in beam
Why do we provide extra reinfocement bars at the end portion of beam?and how we can calculate the amount of reinfocement?
-
Grade of Cement
Is there any grade for PPC? If not, why?
-
Steel detailing
Explain about steel detailing and where it would be useful with any tips
-
RCC - Column, SLA, Beams and Cover
Explain what are Column, SLA, Beams and Cover?
-
Required Cement quantity
what is the method of calculation for require Cement qty. in 1 Cum brick work with CSM 1:6.
-
Theodolite Least Count
What is least count of theodolite?
-
What is TMT steel?
Explain its properties..
-
-
Efficient Beam
Which is more efficient - rectangular beam or a circular beam? Give example?
Civil Engineering Interview Questions
Ans