18 kpas
What are the 18 different kpas (key process area)define each of them?
-
The test plan achieves the objective of _______
The test plan achieves the objective of _______ Answer 1 Everybody concerned with the project being in sync with respect to the scope, responsibilities, deadlines and deliverables. Answer 2 Everybody concerned with the project being in sync with respect to scope, responsibilities, requirement collection, deadlines and deliverables. Answer 3 Everybody concerned with the project being in sync with...
-
Project with 80 bugs
What can you tell about the project if during testing you found 80 bugs in it?
-
Analyzing or Troubleshooting a problem
What are the steps or methods we use when analyzing or troubleshooting an issue/problem?
-
QA Process
1. In QA team, What does the term Process refer to?2. What are the different type of process?
-
Tag a Release
What does it mean to tag a release? Why is it important to do this before testing?
-
Risk Management Plan
What are the contents of Risk management Plan? Have you ever prepared a Risk Management Plan ?
-
Replace String Method
What is meant by Replace String method and the effective scenarios for writing testcases for the same?
-
QA Professional Task
How does QA verify that existing product functionality is still working while verifying new product features and functionality?
-
UAT Testing
I am asked as to how many test scernarios will be typically created in a mid size project. I think this question does not make any scense as the scenrios is always based on the requirement and scope of the project. but I guess my answer is wrong and I did not get the project. Can anyone tell me what is the correct answer to this question..Thx
-
What is the challenging situation you faced with developer?
What is the challenging situation you faced with developer? How you reach project dead line( Suppose you work on multiple projects, one project completed 40% and other is 60% then what you do?
-
QA Testing Interview Questions
Ans