Strung bus
What is meant by strung bus and where is going to be used and what is purpose of it?
-
Modular and Conventional UPS
What are the differences between modular and conventional UPS and its applications?
-
Roles and Responsibilites of Electrical Engineer in Cement Plant
What are the roles, responsibilities and work of an electrical engineer in a cement plant?
-
Voltage without Current and Current without Voltage
Is there any case that we could face or find Voltage without Current and Current without Voltage?
-
Convertion of Energy
Can mechanical energy be directly converted into electrical energy? Explain
-
Megger Test
Dear All,
I have a done a house hold wiring for villa, During a megger test we notice that valve between phase and neutral is good 500 Mohm when test between Phase to earth wire it is shown as less than 100 Mohm when I remove the all wire from conduit and we test it is showing correctly as 500Mohm, After that i replaced all wire as New before pulling the wire in conduit i checked it is shown... -
Multi User OS
Which of the following options relate to a Multi User OS?
UNIX
Windows
Mac
All of the mentioned options
-
Consumption for 20 km under ground cable
hi every one
noticed when we prepair to the 20 km under ground cable operation that the kwh meter record covsumption on no load state and zero on kvarh meter ???
why???? -
Transformer Rating
How to identify Transformer rating without Name Plate details?
-
Insulation Value
What is the thumb rule for insulation value in bus bars, phase to phase and phase to earth for 11 & 33 KV system?
-
Min BDV Transformer Oil
How much min BDV of oil in transformer is required when charged it first time in 11kv, 66kv and 132 kv of transformer?
-
Power of KW Motor
Why 660v is use in place of 440v in some big KW motor?
-
132KV Transmission Line
What is standard height of P, R & S towers used in 132KV transmission lines?
-
NGR in Transformer / Generator Protection
How to calculate the NGR resistance to connect in alternator / transformer. I mean to say thumb rule of NGR against MW capacity of alternator / transformer.
-
-
Elements in Electrical Engineering
What are the elements in electrical engineering?
-
Start Induction Motor
Explain How to Start a Induction Motor?
-
Switch Gear and Transformer Soaking Test
What are the technical reasons for Soaking Test in Transformer and Switch Gear?
-
Can Neutral be Earthed at Load Side?
Neutral is connected to Earth at the source to ground, the unbalanced current in the electrical network mainly in distribution system, What happens if we connect neutral to earth at load side DB?
-
Measure Cross-Sectional Area of a Cable
How to measure the cross-sectional area of a cable which is 1000 sq. mm.?
Electrical Engineering Interview Questions
Ans