Standard size of centering materials
What is the standard size of centering sheet, jack or props, acro span (in open and closed position)?
-
Industrial Building
How much opening area % (windows,doors) required for industrial building
-
Rate Analysis for Hammering pile foundation
Details for machinery charges labor charges.etc..
-
Cantilever
What is the class of cantilever?
-
Design basket ball post
A basketball post is to be constructed.height 10 ft and it has to offset 10 ft from the main post preffered to use round tube hollow steel tubes .can you give me some suggetions on shapes(how to cantilever the 10ft portion)member sizes etc it has to support weight of a player (100kg)
-
UAT
What is UAT? Can someone explain?
-
Quantity Survey Billing Engineer - Disposal of derbies
Disposal of derbies any activity completion in contractors scope yes or no
-
Quantity Survey Billing Engineer - Rate of verified tile flooring
Rate of verified tile flooring is less than that of dado...yes or no and give reason
-
Working Drawing v/s Submission Drawing
What is the different between Working drawing and Submission drawing?
-
Structural design
I would like to obtain a free software for structural design of concrete elements.
Thanks
manoj -
-
Distribution Steel
Why is distribution steel provided only in one way slab and not in two way slab?
-
Storm Water Drain closure
Dear sir,
Required the below mentioned details for the Storm Water Canal
Thickness 6Inchs
Length : 90 ft
Breadth: 20 ft
Tons of steel required?
-
Concrete Technology
If AIV for specimen A is 25% and that for specimen B is 45% Which one is better for surface of a pavement? Justify it.
-
Expansion Joint in Steel
If you have a 40m.l ladder inside a building, in how many meter does expansion joint is required? How much it would be?
-
Face Left and Face Right Vertical Angle Change
Why vertical angle change in face left and face right at the time of ets measurement? What is the acceptable range?
-
Compressible Testing of Concrete
I tested 28 days cube
results are
1. 38.66
2. 37.77
3. 48.89
Average - 41.77
This result is fail or pass
If we don't consider variation failed
-
Calculate Labors Required
How much labor is required for 1 cum of concrete for placing, mixing and vibrating.
-
Area of Column Calculation
How much steel is required for a column of 11 mtr. height and what is the total M3 area of column?
-
PPC & OPC
which cement is better , OPC or PPC?
and what is the strengths of OPC & PPC ?
Civil Engineering Interview Questions
Ans