Distribution Steel
Why is distribution steel provided only in one way slab and not in two way slab?
-
Precast Concrete Connections
How are precast concrete connections constructed?
-
RCC Vs Steel Design
What are the basic differences between the RCC design & Steel design?
-
Percentage of Steel and Concrete
How many Percentage of Steel and Concrete in a column and Slab
-
Bulking of sand
What do u mean by bulking of sand
-
Working Drawing v/s Submission Drawing
What is the different between Working drawing and Submission drawing?
-
Calculate plastic section modulus(z)
How to calculate plastic section modulus(z) and second moment in beam delta?if impossible of example number calculate
-
RCC - Column, SLA, Beams and Cover
Explain what are Column, SLA, Beams and Cover?
-
Reinforcement in beam
Why do we provide extra reinfocement bars at the end portion of beam?and how we can calculate the amount of reinfocement?
-
-
Structural design
I would like to obtain a free software for structural design of concrete elements.
Thanks
manoj -
Quantity Survey Billing Engineer - maintenance of JCB.
JCB Hiring rate includes maintenance of JCB....yes or no
-
Eexcavation level readings
We get excavation level readings more accurate with total station, say yes or no ( and give reason)
-
-
Why do you change to environmental engineering from civil engineering ?
Why do you choose environmental engineering and why do you want to change
-
-
Cube test
I am casting Raft and get the cube .after seven days test the cube that was pass as per rule so i will testing after 28 day ? yes or no? and why?
-
DMC piling method
Full statement of dmc piling method with compleat description about boring to casting if possible picture also.
-
-
Required quantity of steel
what is the method of calculate the requirement steel quantity in 1 cum RCC.
Civil Engineering Interview Questions
Ans