Cost Evaluation Process
What is the process of cost evaluation in a project?
-
RCC Pipes
What is the difference between Hume pipes, spun pipes, NP 2, NP3, NP4, pipes?Test requirements of above pipes.
-
-
What is diff between force and weight?
Force acts in any direction but weight acts only in downward direction
-
RCC - Required Binding wire
(for 1.0MT steel), Nails & Lubricant (for 1.0 Sqm shuttering)
In RCC what are the required quantities for:
1. Binding wire required for 1.000 MT of TMT Reinforcement bars.
2. Nails for 1.00 Sqm Shuttering.
3. Lubricant/Black oil/ Deisel/ grease for 1.00 Sqm Shuttering. -
Area of Column Calculation
How much steel is required for a column of 11 mtr. height and what is the total M3 area of column?
-
Cement estimation
no.of cement bag required in 30*50 plot having 4room(12*8) 2kitchen(5*8) 1hall(15*10) and 1w/c(4*4) and 1bath(6*4)
-
Efficient Beam
Which is more efficient - rectangular beam or a circular beam? Give example?
-
-
Design of foundations
Why for design of foundations only service load combinations are used? Why not design?
-
Structural engineering
what is the difference between DEFLECTION AND DEFORMATION? Explain
-
Autometic level
what is the maximum visibility of staff reading by auto level as per IS code
-
Calculate Column Rings and Bars
How to calculate number of rings of a column & how to calculate weight of column rings & column bars.
-
Rate Analysis for Hammering pile foundation
Details for machinery charges labor charges.etc..
-
Steel detailing
Explain about steel detailing and where it would be useful with any tips
-
Calculate Labors Required
How much labor is required for 1 cum of concrete for placing, mixing and vibrating.
-
Compressible Testing of Concrete
I tested 28 days cube
results are
1. 38.66
2. 37.77
3. 48.89
Average - 41.77
This result is fail or pass
If we don't consider variation failed
-
-
Volume of Limestone Pile
How can we calculate the volume of limestone pile? (in cement industry)
-
Volume of Limestone Pile
How can we calculate the volume of Limestone Pile by formula?
Can we calculate this by using the formula,
V = (L x W x H)/2 + (π r2)/3
where
L = Length of Pile
W = Width of Pile
H = Height of Pile
r = Radius of Cone
I have confusion using this formula. The L, W , H and r are not cleared to me.
Can anybody help...